Case Studies
View Case Studies
- HD Studio Upgrade for Astro in Malaysia
- Build of Unit 8 HD Outside Broadcast Truck for 021 Television
- Build of Unit 7 HD Outside Broadcast Truck for 021 Television
- Design and Installation of Al Jazeera Studio Upgrade
- HD Broadcast Cable Installation at Four Football Stadia in Qatar
Project: Design and Installation of Al Jazeera Studio Upgrade
Overview
Al Jazeera required an equipment upgrade to one of their control rooms as the existing equipment had become obsolete. They also took the opportunity to upgrade various other systems within the control rooms.
Solution
The project involved the replacement of key items of equipment including a Sony DVS-9000 vision mixer, Pixel Power graphics, and two Miranda multi-viewer systems driving eight new large 52” Sony LCD panels, Midas audio mixing console and Miranda iControl monitoring system.
Outcome
Monitor stacks and desk furniture had to be either modified or replaced and this was performed around the operational requirements of a working studio requiring a great deal of flexibility and management.
Feedback
After a full tender process, Al Jazeera awarded the contract to Gearhouse Broadcast Systems Integration division.