• RENTAL

    Rental

    Short or long term rental, great prices and 24/7 Technical Support.

    +919819049120

  • PROJECT SOLUTIONS

    Project Solutions

    Temporary broadcast facilities anywhere in the world.

    +919819049120

  • SYSTEMS INTEGRATION

    Systems Integration

    Independent, Bespoke Systems Integration.

    +919819049120

  • BLOG
  • UK

    Gearhouse Broadcast UK

    Rental
    Sales
    Project Solutions
    System Integration +44 (0) 845 820 0000

  • USA

    Gearhouse Broadcast USA

    Rental
    Sales
    Systems Integration
    Mobile Solutions +1 818 955 9449

  • Australasia

    Gearhouse Broadcast Australasia

    Outside Broadcast
    Rental
    Project Solutions
    Presentation Solutions +61 (0)2 9313 3100

  • Qatar

    Gearhouse Broadcast Qatar

    Rental
    Sales
    Project Solutions
    System Integration +974 4 583 422

  • India

    Gearhouse Broadcast India

    Rental
    System Integration
    Project Solutions +919819867099

United Kingdom

You are currently viewing the page for the India

If you are not from this country or it's surrounding areas, please choose your closest area.

Case Studies Gallery

View prev/next case study: Previous case study Beijing Olympic Games 2008

Project: Cable Installation at World Cup 2006

Overview

Gearhouse Broadcast carried out cable installations for Host Broadcast Services installing all unilateral and multi-lateral cabling at each of the twelve Technical Operation Centres (TOC's) used for the 2006 FIFA World Cup in Germany.

Solution

The cabling included 11mm and 14mm coaxial camera triax cable, SMPTE 311 fibre optic HD camera cable, video coaxial cable, audio multi-ways and data cable - which added up to 700 kilometres of cable.  From as early as April four rigging teams moved between venues rigging and installing cable. Due to various connectors used by the broadcasters in Europe, three different standards of triax connectors were utilised on all the camera cable.

Outcome

The provision of multi lateral cabling allowed for the production of the world feeds. All signals were set up to pass from the multilateral outside broadcast vans to all broadcasters for bookable facilities via the Technical Operation Centre. The signals also interfaced with all incoming and outgoing feeds and all unilateral cable was installed as per the specific requirements booked by these broadcasters with HBS from each venue via the local telecommunications supplier. In addition Gearhouse Broadcast provided HBS with broadcast partner cabling at each venue for broadcasters to produce their own style and flavour of their transmission back to their home countries.

Feedback

A wide variety of ancillary services were also catered for in the TOC’s such as tape play outs, signal conversion, audio multiplexing and de–multiplexing, camera stand ups, presentation and interview studios.