Case Studies
View Case Studies
Case Studies Archive
Gearhouse Broadcast Helps Take Sky Sports F1 Coverage on the Road
After competing in a fully competitive tendering process, Gearhouse Broadcast’s Projects Solutions division was awarded the contract to build a series of interconnecting Flyaway Pods for satellite broadcaster British Sky Broadcasting for their coverage of...
Beijing Olympic Games 2008
Gearhouse Broadcast was selected by technology project managers Siemens to provide BBC Sport with the systems integration of the BBC’s International Broadcast Centre at the main Olympic International Broadcast Centre in Beijing.
UEFA Euro 2008
Gearhouse Broadcast’s Project Solutions built and installed the Technical Operation Centres (TOC’s) used for the UEFA EURO 2008 tournament. There were four stadia situated in Austria in Vienna, Innsbruck, Klagenfurt and Salzburg and four stadia...
iRB Rugby World Cup New Zealand 2011
ITV Sport has appointed television broadcast services specialist Gearhouse Broadcast to supply both project solutions and broadcast equipment to integrate ITV’s coverage of the IRB Rugby World Cup. Their Technical Operation Centre in Auckland and...
Australian Open Tennis 2005 - 2011
Working to Channel 7’s brief Gearhouse Broadcast’s Project Solutions division provided a high definition facility for the Open’s main courts of Rod Laver and Hisense for the first time in the history of the event....
HD Studio Upgrade for Astro in Malaysia
After competing in a fully competitive tendering process, Gearhouse Broadcast’s Systems Integration division was awarded the contract to upgrade Astro’s studio facilities in Kuala Lumpur to accommodate HD productions. The studios are used by both...
Design and Installation of Al Jazeera Studio Upgrade
Al Jazeera required an equipment upgrade to one of their control rooms as the existing equipment had become obsolete. They also took the opportunity to upgrade various other systems within the control rooms.
FIFA World Cup South Africa 2010
Gearhouse Broadcast was used by seven major multinational broadcasters to supply both project solutions and equipment at the 2010 FIFA World Cup in South Africa. Gearhouse Broadcast’s Project Solutions built and installed...
ATP Masters 1000 Series 2000 - 2011 (Montreal)
A demanding schedule of 10 events taking place across the world covering Cincinnati, Shanghai, Indian Wells, Madrid, Miami, Monte-Carlo, Montreal, Paris and Rome, concluding with the World Tour Finals which since 2009 has been staged...
HD Broadcast Cable Installation at Four Football Stadia in Qatar
Gearhouse Broadcast and associate company AV Tech were awarded the contract to upgrade the technical infrastructure at four football stadia in Doha, Qatar – Al Gharaffa, Al Rayyan, Al Sadd Sports Club and the Qatar...